• 0 Posts
  • 8 Comments
Joined 1 year ago
cake
Cake day: July 3rd, 2023

help-circle






  • Naive, perhaps, but if a company advertises a service, they better fucking deliver on that service. Sure, I wouldn’t store all of my important documents solely on a cloud service either, but let’s not victim blame the guy here who paid for a service and was not given that service. Google’s Enterprise plan promised unlimited data; whether that’s 10 GB or 200 TB, that’s not for us nor Google to judge. Unlimited means unlimited. And in an article linked in the OP, even customer service seemed to assure them that it was indeed unlimited, with no cap. And then pulled the rug.

    And on top of that, according to the article, Google emailed them saying their account would be in “read-only” mode, as in, they could download the files but not upload any. Which is fine enough-- until Google contacted them saying they were using too much space and their files would all be deleted. Space that, again, was originally unlimited.

    Judge the guy all you want, but don’t blame him. Fuck Google, full stop.


  • HOLY FUCK I AM SO FUCKING HARD

    …small concern though: I currently use the rail planner a lot, usually to map out how I want my outposts to look at long distances. If the rail planner, particularly shift + click, is actively looking for rails to snap to, I hope it won’t greedily try to snap to rails I don’t want it to. I’m sure the devs already have this considered, but I just want to make sure that if I have multi-layer train crossings, and I’m trying to plan them out before I actually build them, that I’m able to path out rails behind an elevated rail without the rail planner assuming I want the rail to connect to the elevated rail. I hope that won’t be an annoying issue.